Loading Events

« All Events

  • This event has passed.

BOS Meeting via Video Conference at 7:30 pm. Link: https://us02web.zoom.us/j/83078148209?pwd:M3d3QWthWGtMWVhvckVWekFmVGt0Zz09

May 13, 2020 @ 7:30 pm - 8:30 pm

REGULAR MONTHLY MEETING VIA VIDEO CONFERENCE – MAY 13, 2020 – AGENDA – 7:30 P.M.

1 – CALL THE MAY 13, 2020, REGULAR MONTHLY MEETING OF THE BOARD OF SUPERVISORS TO ORDER

2 – PLEDGE OF ALLEGIANCE  

3 – THIS MEETING IS BEING RECORDED.  IF ANYONE IS TAPING THIS MEETING, PLEASE STATE YOUR NAME AND ADDRESS

4 – ROLL CALL

5 – ANNOUNCEMENT OF EXECUTIVE SESSIONS; PERSONNEL; AND/OR INFO-GATHERING MEETINGS OF THE BOARD:

 a) The Buffalo Township Board of Supervisors met via video conference with their Solicitor for an Executive Session on May 13.

6 – APPROVAL OF THE MINUTES from the April 22, 2020 Regular Monthly Meeting of the Buffalo Township Board of Supervisors as recorded

7 – ACCEPTANCE OF THE TREASURER’S REPORT FOR APRIL 1-30, 2020

     INCLUSIVE FOR AUDIT

8 – MOTION TO PAY THE MONTHLY BILLS

OLD BUSINESS:

 NEW BUSINESS:

 LAND DEVELOPMENT

SARVER DOLLAR GENERAL – 339 N. PIKE ROAD – NEW PRELIMINARY/FINAL SITE PLAN

PTV 1078, LLC is resubmitting a new proposal to construct the Sarver Dollar General Store located along N. Pike Road (SR 356) located in Buffalo Township, Butler County, PA.  The site is currently meadow land cover and a small gravel driveway area.  The site has no existing buildings.  The proposed development includes the construction of a 9,100 square foot Dollar General retail store, access driveway from N. Pike Road, parking areas, drive aisles, stormwater management facility(s), onsite sanitary disposal system, and other associated site improvements.  Because the area of disturbance is greater than one (1) acre, and application for a general NPDWES Stormwater Permit Authorizing the Discharge of Stormwater During Construction Activities will be submitted to the Butler County Conservation District and the Pennsylvania Department of Environmental Protection (PADEP).

Rec’d              New Preliminary/Final Site Plan

Rec’d              Filing Fee

Rec’d              Site Plan Application

Rec’d              Stormwater Management Plan

Rec’d              Butler County Planning Commission Comments

Rec’d              Municipal Authority Comments

Rec’d              Bankson Engineer Comments

Rec’d              Planning Commission Comments

———————————————————————————————————————

PALKO’S/WALTERS PLAN NO. 1 –  EKASTOWN ROAD – SUBDIVISION

Timothy Walters is purposing to subdivide property located off Ekastown Road.  The main tract of land is 102.8 acres.  After the subdivision, 4 acres will be removed from the original tract of land making it 98.8 acres.  Once subdivision is completed a culvert will be installed (GP-7 pending), driveway off existing right of way will be constructed and grading of approximately 0.5 acre will occur so that a 2,100 square foot house with attached 2 car garage can be built.

Rec’d              Application

Rec’d               Filing Fee

Rec’d              Plan Drawings

Rec’d               BCPC Comments

Rec’d              BC Conservation District Comments

Rec’d              Sewage Permit Issued

Rec’d              MABT Comments

Rec’d               Bankson Engineer Comments

Rec’d              Planning Commission Comments

Rec’d              Fee in Lieu of

————————————————————————————————————————————————————-

TWIN OAKS PRD NO. 1 PHASE 3 – SITE/SUBDIVISION PLAN

Lennon, Smith, Souleret Engineering Inc. is submitting the proposed Twin Oaks PRD No. 1 Phase 3 Site/Subdivision Plan located on 44 acres on the eastern side of Hepler Road in Buffalo Township, Butler County, PA.  The Tentative PRD approval was granted in 2016 for 98 single-family homes (AKA Rolling Ridge).  In 2017, Phase One was granted final approval and construction was initiated.  The Tentative Approval called for 37 lots in Phase One, 21 Lots in Phase 2 and 40 lots in Phase 3.  Due to the rate of lot sales, the developer switched Phase 2 and Phase 3.  The prior Phase 2 became Phase 3 and now Phase 2 will become Phase 3.  Phase 3 has a total number of 21 lots and which run along Red Horse Drive and Blue Meadow Drive.  This is the final phase of the Twin Oaks PRD Number One.

Rec’d              Application

Rec’d              Filing Fee

Rec’d              Plan Drawings

Rec’d              MABT Comments

Rec’d               Bankson Engineer Comments

Rec’d              Planning Commission Comments

Rec’d              Fee In Lieu Of

———————————————————————————————————————

REMARKS FROM THE FLOOR                                                              ADJOURNMENT      

 

Details

Venue

Organizer