BUFFALO TOWNSHIP PLANNING COMMISSION VIA VIDEO CONFERENCE – AGENDA – MAY 6, 2020

1 – CALL THE MAY 6TH, 2020 MEETING OF THE BUFFALO TOWNSHIP PLANNING

      COMMISSION MEETING TO ORDER

 2 – PLEDGE OF ALLEGIANCE

 3 – THIS MEETING IS BEING RECORDED, IF ANYONE IS TAPING THIS

      MEETING, PLEASE STATE YOUR NAME AND ADDRESS

 4 – ROLL CALL

 5 – APPROVAL OF THE MINUTES FOR THE MARCH 4, 2020 REGULAR

      MONTHLY MEETING OF THE BUFFALO TOWNSHIP PLANNING

      COMMISSION, AS RECORDED

———————————————————————————————————————

LAND DEVELOPMENT

SARVER DOLLAR GENERAL – 339 N. PIKE ROAD – NEW PRELIMINARY/FINAL SITE PLAN

Sarver Dollar General New Preliminary/Final Site Plan was tabled at the March 4, 2020 Planning Commission Meeting.  Remove from table.

PTV 1078, LLC is resubmitting a new proposal to construct the Sarver Dollar General Store located along N. Pike Road (SR 356) located in Buffalo Township, Butler County, PA.  The site is currently meadow land cover and a small gravel driveway area.  The site has no existing buildings.  The proposed development includes the construction of a 9,100 square foot Dollar General retail store, access driveway from N. Pike Road, parking areas, drive aisles, stormwater management facility(s), onsite sanitary disposal system, and other associated site improvements.  Because the area of disturbance is greater than one (1) acre, and application for a general NPDWES Stormwater Permit Authorizing the Discharge of Stormwater During Construction Activities will be submitted to the Butler County Conservation District and the Pennsylvania Department of Environmental Protection (PADEP).

Rec’d              New Preliminary/Final Site Plan

Rec’d              Filing Fee

Rec’d              Site Plan Application

Rec’d              Stormwater Management Plan

Rec’d              Butler County Planning Commission Comments

Rec’d              Municipal Authority Comments

Rec’d              Bankson Engineer Comments

———————————————————————————————————————

PALKO’S/WALTERS PLAN NO. 1 –  EKASTOWN ROAD – SUBDIVISION

Timothy Walters is purposing to subdivide property located off Ekastown Road.  The main tract of land is 102.8 acres.  After the subdivision, 4 acres will be removed from the original tract of land making it 98.8 acres.  Once subdivision is completed a culvert will be installed (GP-7 pending), driveway off existing right of way will be constructed and grading of approximately 0.5 acre will occur so that a 2,100 square foot house with attached 2 car garage can be built.

Rec’d              Application

Rec’d               Filing Fee

Rec’d              Plan Drawings

Rec’d               BCPC Comments

Rec’d              BC Conservation District Comments

Rec’d              Sewage Permit Issued

Rec’d              MABT Comments

Rec’d               Bankson Engineer Comments

Fee in Lieu of

———————————————————————————————————————

OBERG INDUSTRIES – 275 N. PIKE ROAD –  PRELIMINARY SITE PLAN/LOT LINE REVISION

Oberg Industries, Inc. is planning for the construction of the Oberg – Building Addition project, located at 275 N. Pike Road (SR-356) in Buffalo Township, Butler County.  The proposed development will require a Major Modification to the existing NPDES Permit #PAI-0610-14-003 and will consist of construction of a 62,500 sq. ft. addition to an existing light manufacturing building, associated parking and loading areas, additional erosion and sediment control and post construction stormwater management facilities, utilities, and earthmoving activities.

Rec’d              Application

Rec’d               Filing Fee/Fees

Rec’d              Plan Drawings

Rec’d               MABT Comments

Rec’d               Bankson Engineer Comments

———————————————————————————————————————

TWIN OAKS PRD NO. 1 PHASE 3 – SITE/SUBDIVISION PLAN

Lennon, Smith, Souleret Engineering Inc. is submitting the proposed Twin Oaks PRD No. 1 Phase 3 Site/Subdivision Plan located on 44 acres on the eastern side of Hepler Road in Buffalo Township, Butler County, PA.  The Tentative PRD approval was granted in 2016 for 98 single-family homes (AKA Rolling Ridge).  In 2017, Phase One was granted final approval and construction was initiated.  The Tentative Approval called for 37 lots in Phase One, 21 Lots in Phase 2 and 40 lots in Phase 3.  Due to the rate of lot sales, the developer switched Phase 2 and Phase 3.  The prior Phase 2 became Phase 3 and now Phase 2 will become Phase 3.  Phase 3 has a total number of 21 lots and which run along Red Horse Drive and Blue Meadow Drive.  This is the final phase of the Twin Oaks PRD Number One.

Application

Filing Fee

Rec’d              Plan Drawings

Rec’d              MABT Comments

Rec’d               Bankson Engineer Comments

Fee In Lieu Of

———————————————————————————————————————

REMARKS FROM THE FLOOR                                                              ADJOURNMENT       