- This event has passed.
Planning Commission Meeting will be held at 7:30 pm
BUFFALO TOWNSHIP PLANNING COMMISSION – AGENDA – MARCH 4, 2020
1 – CALL THE MARCH 4TH, 2020 MEETING OF THE BUFFALO TOWNSHIP PLANNING
COMMISSION MEETING TO ORDER
2 – PLEDGE OF ALLEGIANCE
3 – THIS MEETING IS BEING RECORDED, IF ANYONE IS TAPING THIS MEETING, PLEASE STATE
YOUR NAME AND ADDRESS
4 – ROLL CALL
5 – APPROVAL OF THE MINUTES FOR THE FEBRUARY 5, 2020 REGULAR MONTHLY MEETING OF THE BUFFALO TOWNSHIP PLANNING COMMISSION, AS RECORDED
——————————————————————————————————————————–
LAND DEVELOPMENT
TWIN OAKS PRD NO. 1 PHASE 2 – REVISED FINAL SITE/SUBDIVISION PLAN
Tabled at February 5th, 2020 meeting. Remove from table. Lennon, Smith, Souleret Engineering Inc. is submitting the proposed Twin Oaks PRD No. 1 Phase 2 Revised Final Site/Subdivision Plan located on 44 acres on the eastern side of Hepler Road in Buffalo Township, Butler County, PA. The Tentative PRD approval was granted in 2016 for 98 single-family homes (AKA Rolling Ridge). In 2017, Phase One was granted Final approval and construction was initiated. The Tentative Approval called for 37 lots in Phase One, 21 lots in Phase 2 and 40 lots in Phase 3. Due to the rate of lot sales, the developer will be constructing the original Phase Three as the new Phase Two. The prior Phase Two will now become Phase 3. The basic layout of the lots and number of lots for Phase 2 formally Phase 3 has not changed. The PRD Site Data Chart has been updated with the new phasing. The cumulative density and percentage of open space still falls in the allowable PRD standards.
Rec’d Application: From previous submission that was denied August 14, 2019
Rec’d Filing Fee: From previous submission that was denied August 14, 2019
Rec’d 5 Copies of the Plan (Revised Plan)
*** Fee In Lieu of
Rec’d Butler County Planning Commission Comments: From previous submission that
was denied August 14, 2019
Rec’d Municipal Authority of Buffalo Township Comments
Rec’d Bankson Engineer Comments
——————————————————————————————————————————–
SARVER DOLLAR GENERAL – 339 N. PIKE ROAD – NEW PRELIMINARY/FINAL SITE PLAN
Sarver Dollar General Preliminary/Final Site Plan was tabled at the October 2, 2019 Meeting. Extension letter received November 6, 2019. Letter received December 23, 2019 regarding project termination.
PTV 1078, LLC is resubmitting a new proposal to construct the Sarver Dollar General Store located along N. Pike Road (SR 356) located in Buffalo Township, Butler County, PA. The site is currently meadow land cover and a small gravel driveway area. The site has no existing buildings. The proposed development includes the construction of a 9,100 square foot Dollar General retail store, access driveway from N. Pike Road, parking areas, drive aisles, stormwater management facility(s), onsite sanitary disposal system, and other associated site improvements. Because the area of disturbance is greater than one (1) acre, and application for a general NPDWES Stormwater Permit Authorizing the Discharge of Stormwater During Construction Activities will be submitted to the Butler County Conservation District and the Pennsylvania Department of Environmental Protection (PADEP).
Rec’d New Preliminary/Final Site Plan
Rec’d Filing Fee
Rec’d Site Plan Application
Rec’d Stormwater Management Plan
*** Butler County Planning Commission Comments
Rec’d Municipal Authority Comments
Rec’d Bankson Engineer Comments
———————————————————————————————————————
OLD BUSINESS
DISCUSSION REGARDING ADVERTISING THE SCHEDULING OF DATES FOR WORKSHOPS AND CHANGING THE TIME FOR THE PLANNING COMMISSION MEETINGS AND WORKSHOPS.
REMARKS FROM THE FLOOR ADJOURNMENT
