Loading Events

Planning Commission Meeting at 7:30 pm

06 November 2019

BUFFALO TOWNSHIP PLANNING COMMISSION – AGENDA – NOVEMBER 6, 2019

1 – CALL THE MEETING TO ORDER

 2 – PLEDGE OF ALLEGIANCE

 3 – THIS MEETING IS BEING RECORDED

 4 – IF ANYONE IS TAPING THIS MEETING, PLEASE STATE YOUR NAME AND ADDRESS

 5 – ROLL CALL

 6 – APPROVAL OF THE MINUTES FOR THE OCTOBER 2, 2019 REGULAR MONTHLY MEETING OF THE BUFFALO TOWNSHIP PLANNING COMMISSION, AS RECORDED

————————————————————————————————————————–

LAND DEVELOPMENT

DOLLAR GENERAL – 339 N. PIKE ROAD – PRELIMINARY/FINAL SITE PLAN

Dollar General Preliminary/Final Site Plan was tabled at the October 2, 2019 Meeting.  Remove from table.

PTV 1078, LLC is proposing to construct the Sarver Dollar General Store located along N. Pike Road (SR 356) located in Buffalo Township, Butler county, PA.  The site is currently meadow land cover and a small gravel driveway area.  The site has no existing buildings.  The proposed development includes the construction of a 9,100 square foot Dollar General retail store, access driveway from N. Pike Road, parking areas, drive aisles, stormwater management facility(s), onsite sanitary disposal system, and other associated site improvements.  Because the area of disturbance is greater than one (1) acre, and application for a general NPDWES Stormwater Permit Authorizing the Discharge of Stormwater During Construction Activities will be submitted to the Butler County Conservation District and the Pennsylvania Department of Environmental Protection (PADEP).

Rec’d               Preliminary/Final Site Plan

Rec’d               Preliminary/Final Site Plan Filing Fee

Rec’d               Preliminary/Final Site Plan Application

Rec’d               Stormwater Management Plan

Rec’d               Butler County Planning Commission Comments

Rec’d               Municipal Authority Comments

Rec’d               Bankson Engineer Comments

————————————————————————————————————————–

WEAVER HOMES – HERITAGE CROSSING – S. PIKE ROAD – FINAL SITE/SUBDIVISION PLAN

Weaver Homes/Heritage Crossing Final Site/Subdivision Plan was tabled at the October 2, 2019 Meeting.  Remove from table.

Gateway Engineers, Inc. is submitting the proposed Heritage Crossing Final Site/Subdivision Plan on behalf of Weaver Homes.  The proposed site is a 25.033-acre parcel consisting of 3 lots located at S. Pike Road, an open parcel south-west of the intersection of Mulone Drive and S. Pike Road.  The present zoning of the property is B-1 & B-2.  The proposed construction of multi-family units will be comprised of 20 buildings containing 4 residential units per building, for a total of 80 residential units, common area-clubhouse with pool and a public road to be dedicated to the township.  Public water & sewage are available in the vicinity of this proposed site.

Rec’d               Final Site/Subdivision Plan

Rec’d               Final Site/Subdivision Plan Fees

Rec’d               Final Site/Subdivision Plan Applications

Rec’d               Post-Construction Stormwater Management Report

Rec’d               Highway Occupancy Plan

Rec’d               DEP Approval Letter

Rec’d               Butler County Conservation District Comments

Rec’d               Butler County Planning Commission Comments

Rec’d               Municipal Authority Comments

Rec’d               Bankson Engineer Comments

Fee in Lieu of

————————————————————————————————————————–

BUFFALO CREEK NATURE CENTER – 154 MONROE ROAD – FINAL SITE PLAN & LOT LINE REVISION

This proposed project involves site improvement to a property formerly known as the Oregon Club, owned by Buffalo Township, to support the renovation of an existing building as a nature center by the Audubon Society of Western Pennsylvania.  The present zoning of this property is C-1 and is proposed property is 5.88 acres.  Bankson Engineers supplied the Lot Line Revision Plans.

Rec’d               Final Site Plan/Lot Line Revision

Waived            Final Site Plan/Lot Line Revision Fee

Rec’d               Final Site Plan/Lot Line Revision Application

Rec’d               Butler County Planning Commission Comments

Rec’d               Stormwater Management Plan

Rec’d               Erosion & Sediment Control Plan

Rec’d               Municipal Authority Comments

Rec’d               Bankson Engineer Comments

————————————————————————————————————————-

  1. DISCUSSION REGARDING ERECTING A STRUCTURE FOR THE PURPOSE OF RUNNING A HOME-BASED BUSINESS AT 334 SARVER ROAD
  2. DISCUSSION REGARDING A NO IMPACT HOME-BASED BUSINESS AT 804 S. PIKE ROAD
  3. PRE-APPLICATION DISCUSSION REGARDING OAK CREEK FARMS LOCATED OFF OF PARKER ROAD

————————————————————————————————————————–

REMARKS FROM THE FLOOR                                                                ADJOURNMENT       

 

 

  • Start:
    Nov 06 @ 07:30 pm
  • End:
    Nov 06 @ 08:30 pm

Rhonda Sue Swartz

  • Phone:
    724-295-2648

Buffalo Township Municipal Building